Respected readers, authors and reviewers, you can add comments to this page on any questions about the contribution, review, editing and publication of this journal. We will give you an answer as soon as possible. Thank you for your support!
LI Mao-tian, CHEN Zhong-yuan, XUE Yuan-zhong, GU Qing-hua. DEM Simulation of Sediment Movement in the Baogang Dock Frontal Channel(Chinese)[J]. Journal of East China Normal University (Natural Sciences), 2005, (2): 72-77.
Citation:
LI Mao-tian, CHEN Zhong-yuan, XUE Yuan-zhong, GU Qing-hua. DEM Simulation of Sediment Movement in the Baogang Dock Frontal Channel(Chinese)[J]. Journal of East China Normal University (Natural Sciences), 2005, (2): 72-77.
LI Mao-tian, CHEN Zhong-yuan, XUE Yuan-zhong, GU Qing-hua. DEM Simulation of Sediment Movement in the Baogang Dock Frontal Channel(Chinese)[J]. Journal of East China Normal University (Natural Sciences), 2005, (2): 72-77.
Citation:
LI Mao-tian, CHEN Zhong-yuan, XUE Yuan-zhong, GU Qing-hua. DEM Simulation of Sediment Movement in the Baogang Dock Frontal Channel(Chinese)[J]. Journal of East China Normal University (Natural Sciences), 2005, (2): 72-77.
the sediment variation in the Baogang dock frontal channel from 1994 to 2002 was simulated using DEM (Digital Elevation Model) and GIS (Geography Information System). The results were as fol-lowing: the Baogang dock channel was general character of erosional from 1994 to 2002, and the total erosion quantity is 113.563×106m3; the average rate of erosion was 14.195×106m3/a;From 1994 to 1999, the channel was erosional, and the total erosion quantity was 53.286×106m3; 1999 to 2002,Baogang dock channel was also erosional, and the total erosion quantity was 60.277×106m3. Sediment was distributing in the upside area about Shangduan Sand and the area between the Shangduan Sand and the New Liuhe Sand. The channel change was a result of the channel borderline conditions, water discharge, suspended sediment load and human activities. The continual movement of the Shanduan Sand to southeast exert potential pre-ssure on the development of Baogang dock.