Respected readers, authors and reviewers, you can add comments to this page on any questions about the contribution, review, editing and publication of this journal. We will give you an answer as soon as possible. Thank you for your support!
CHEN Yu-lan;ZHENG Jun;HU Wen-xin, . Algorithm for resource scheduling based on multiQoS constraints(Chinese)[J]. Journal of East China Normal University (Natural Sciences), 2009, (1): 111-116.
Citation:
CHEN Yu-lan;ZHENG Jun;HU Wen-xin, . Algorithm for resource scheduling based on multiQoS constraints(Chinese)[J]. Journal of East China Normal University (Natural Sciences), 2009, (1): 111-116.
CHEN Yu-lan;ZHENG Jun;HU Wen-xin, . Algorithm for resource scheduling based on multiQoS constraints(Chinese)[J]. Journal of East China Normal University (Natural Sciences), 2009, (1): 111-116.
Citation:
CHEN Yu-lan;ZHENG Jun;HU Wen-xin, . Algorithm for resource scheduling based on multiQoS constraints(Chinese)[J]. Journal of East China Normal University (Natural Sciences), 2009, (1): 111-116.
A new algorithm for resource scheduling in grid environment based on multiQoS constraints and greedy method was proposed. It takes a driver function which is determined by parameters“deadline”, “budget”, “time weight” and “cost weight” which the user provided as the greedy criterion. The performance of this new scheduling algorithm, choosing a most economic resource for scheduling each time and achieving the maximum of customer′s satisfaction, is demonstrated by its implementation on Gridsim.